In July 2012 the starboard hull of Magayon II had arrived in Los Banos and needed to be moved further […]
Painting Lemony
The optimist needed a new epoxy coating inside, Summer 2012 Date?
Bohol Roadtrip No. 1
Andy Smith’s boatyard had already finished building the two hulls for Magayon II in 2011.
Protected: Sancara 2003
There is no excerpt because this is a protected post.
Magayon in Indonesia
Norwalk Island Sharpie 23 in Makassar